Packaging Grids
- 1 Introduction
- 2 Getting Started
- 2.1 Permissions
- 2.1.1 Campus Setup Permission
- 2.1.2 Student Permission
- 2.2 Packaging Philosophy Setup
- 2.3 Packaging Grid Setup
- 2.4 Packaging Grid Functionality
- 2.5 Activity Log Entry
- 2.5.1 Event that causes Activity Log Entry
- 2.5.2 Date/Time Created
- 2.5.3 Activity Source
- 2.5.4 UserID
- 2.5.5 Activity Type
- 2.5.6 Entry posted to Description field
- 2.5.7 Sample Activity Log Entry
- 2.1 Permissions
Introduction
Packaging Grid functionality is available in Regent Award. Packaging Grids provide the schools with the ability to configure one or more funds to calculate different award amounts based on a combination of criteria including SAIs and GPAs or User Defined Fields (UDFs) defined by the school. Packaging Grids can be created and configured with the specific criteria to be used in the packaging process. The Packaging Grids can be applied to specific programs, sites, funds, or Federal Award Years.
The packaging process will run through the standard packaging philosophy order, and when reaching a fund with ‘grids’, will reference the fund’s grid configurations to determine eligibility for the particular fund and will then return to the standard packaging philosophy run. Other configured fund rules will continue to apply to funds with ‘grids’, and since not intended for Direct Loan funds, there should be no impact on My Borrowing.
Getting Started
Schools will need to:
Be on or upgrade to Regent Award 5.7.0.0 Release or a subsequent Release
Update Campus Setup Permissions and Student Permissions
Update the Packaging Philosophy Setup for the applicable Funds that will use the Packaging Grid functionality
Configure Packaging Grids under the Packaging Grid Setup on the Menu (beneath the Packaging Philosophy Setup)
Test Packaging Grid Functionality in Regent Award
Permissions
Campus Setup Permission
To access Packaging Grids, Regent Award users must have the 'View Packaging Grid Setup' permission enabled under the Campus Setup Permissions for the role in which the user is assigned. To add new Packaging Grids or update existing Packaging Grids configured, the 'Edit Packaging Grid Setup' permission must also be enabled
Student Permission
To access the Grid Override Wizard, Regent Award users must have the 'Access Grid Override Wizard' permission enabled under the Campus → Student Permissions for the role in which the user is assigned. The Grid Override Wizard campus-level student permission is inheritable from the Institution and Enterprise student permission levels. This permission provides users with the ability to access the wizard and make award adjustments for an individual student via the Awards Tab and the ability to view the information within the wizard without updating the assigned Packaging Grid.
Packaging Philosophy Setup
Funds that are intended to use the Packaging Grid functionality must have the 'Package To' field on Packaging Philosophy set to 'Packaging Grids'. The 'Packaging Grid' option does not display in the dropdown for Title IV funds (e.g. Subsidized Loans, Unsubsidized Loans, Parent PLUS Loans, Grad PLUS Loans, FWS, TEACH, IASG, Perkins, and FSEOG). When the 'Package To' field is set to 'Packaging Grids', the 'Package To Amount' defaults to 'N/A' and is no longer an editable field.
Packaging Grid Setup
An option for 'Packaging Grid Setup' is available beneath the ‘Packaging Philosophy Setup’ on the Campus Setup menu. A listing of configured grids display at the top of the ‘Packaging Grid Setup’ screen. Users are able to add, edit, refresh, copy/rename, and delete grids. A listing of configured grids display at the top of the ‘Packaging Grid Setup’ screen.
Packaging Grid Setup Options
Field Name | Description | Required/Optional | Field Type | Option Values | Business Rules |
---|---|---|---|---|---|
Active | If this field is set to active, this grid is used during the packaging process when Packaging Grids is configured for the fund on the Packaging Philosophy Setup. | Optional | Checkbox |
|
|
Grid Name | The grid name must be a unique name. | Required | Text - 35 character maximum | Alpha-numeric and special characters |
|
Effective Start Date | The date entered here is used to determine when this grid is eligible to be used during packaging based on today's date. | Optional | Date picker | Date | |
Effective End Date | The date entered here is used to determine when this grid is no longer eligible to be used during packaging based on today's date. | Optional | Date picker | Date | |
Packaging Grid Option | When 'All Students' is selected, packaging will attempt to package using this grid for all students for the configured period, sites, and programs. When 'Assign by UDF' is selected, packaging will attempt to package using this grid for a student only if the configured UDF and value are on the student record. | Required | Dropdown |
|
|
Grid UDF | The UDF selected in this field and the value to which it is paired determine that a student with the same UDF and paired value will be awarded using this grid if all other criteria within the grid setup are met. | Required if 'Packaging Grid Option' = Assign by UDF | Dropdown | All UDFs configured in Institution Setup, excluding option values already selected under the Row UDF or Column UDF configurable fields. |
|
Grid UDF Value | The UDF selected above and the value to which it is paired in this field determines that a student with the same UDF and paired value will be awarded using this grid if all other criteria within the grid setup are met. | Required if 'Packaging Grid Option' = Assign by UDF | Text - 80 character maximum | Alpha-numeric and special characters |
|
Package To | The selection in this field determines the packaging target for the award during packaging. | Dropdown |
| See Packaging Philosophy Setup Data Elements for additional information on 'Package To' options. | |
Packaging Frequency | The option selected here determines how often the award is packaged. | Required | Dropdown |
|
|
Persistence Packaging Option | This option selected here determines how the award is managed during the packaging process if the Package Frequency is set to 'Award once per scope period or 'Award once per student'. For example, if the Packaging Frequency is set to 'Award once per student' and the selected Persistence Packaging Option is 'Award Amount', the award amount calculated during the packaging process is saved and used for all subsequent AY or FAY periods in the academic plan. | Required if 'Award once per fund scope period' OR 'Award once for student' is selected | Dropdown |
|
|
Recalculate for Program Changes | When the checkbox is selected, packaging will recalculate the award for a program change the first time the packaging process is run regardless of the Package Frequency configuration. | Optional | Checkbox |
|
|
Fund Associations | When 'Apply Packaging Grid to all funds' is selected, packaging will attempt to package all funds using this grid for the configured period, sites, and programs. When 'Apply Packaging Grid to all funds' is not selected, packaging will attempt to package selected funds using this grid for the configured period, sites, and programs. | Required | Multi-select list box | Lists all funds configured in Fund Setup, except Title IV Funds (i.e. Subsidized Loans, Unsubsidized Loans, Parent PLUS Loans, Grad PLUS Loans, FWS, TEACH, IASG, Perkins and FSEOG) | |
Site Associations | When 'Apply Packaging Grid to all sites' is selected, packaging will attempt to package selected funds using this grid for the configured periods, all sites, and programs. When 'Apply Packaging Grid to all sites' is not selected, packaging will attempt to package selected funds using this grid for the configured periods, selected sites, and selected programs. | Required | Multi-select list box | Lists all sites configured in Site Setup. | |
Program Associations | When 'Apply Packaging Grid to all programs' is selected, packaging will attempt to package selected funds using this grid for the configured periods, selected sites, and all programs. When 'Apply Packaging Grid to all programs' is not selected, packaging will attempt to package selected funds using this grid for the configured periods, selected sites, and selected programs. | Required | Multi-select list box | Lists all programs configured in Program Setup. | |
Federal Award Year Associations | When 'Apply Packaging Grid to all Federal Award Years' is selected, packaging will attempt to package selected funds using this grid for the configured periods, sites, and programs for all Federal Award Years. When 'Apply Packaging Grid to all Federal Award Years' is not selected, packaging will attempt to package selected funds using this grid for the configured periods, sites, and programs for the selected Federal Award Years only. | Optional | Multi-select list box | Lists current Federal Award Year, five previous Federal Award Years, and ten Federal Award Years in the future based on today's date. |
|
Select Grid Criteria: Column | The selection indicated here will be used to identify the eligibility criterion for the column in the packaging grid. If 'None' is selected, there will not be any eligibility criterion for the column in the packaging grid. | Required | Dropdown |
|
Note: The High School GPA is only used in packaging for the student's first Academic Year. All subsequent Academic Years must have a Cumulative GPA sent in the Student Node or SAP node of the SBL. |
Select Grid Criteria: Column UDF | The UDF selected in this field and the column value to which it is paired determines that a student with the same UDF and paired value will be awarded using the grid column with the paired value if all other criteria within the grid setup are met. | Required if the Select Grid Criteria 'Column' = UDF | Dropdown | All UDFs configured in Institution Setup, excluding option values already selected under the Row UDF or Column UDF configurable fields. |
|
Select Grid Criteria: Row | The selection indicated here will be used to identify the UDF that will be used for the column in the packaging grid. If 'None' is selected, there will not be any eligibility criterion for the row in the packaging grid. | Required | Dropdown |
|
|
Select Grid Criteria: Row UDF | The UDF selected in this field and the row value to which it is paired determines that a student with the same UDF and paired value will be awarded using the grid row with the paired value if all other criteria within the grid setup are met. | Required if the Select Grid Criteria 'Row' = UDF | Dropdown | All UDFs configured in Institution Setup, excluding option values already selected under the Row UDF or Column UDF configurable fields. |
|
Add Packaging Grid Example Screenshot
Packaging Grid Functionality
Packaging with No Existing Packaging Grid Results
If the Persistence Packaging Option is set to 'Award/Reaward during packaging process', the student is being packaged for the first time under another Persistence Packaging Option OR the previous Packaging Grid Results were removed due to a program change, no previous Packaging Grid Results exist for the fund. The packaging process will then determine the applicable Packaging Grid to use and award eligibility according to the Packaging Grid criteria met (e.g. 90% of Amount of Direct Costs). The Packaging Grid Results are then saved if the Packaging Grid used is configured with 'Award once per fund scope period' or 'Award once for student' for the Packaging Frequency.
Existing Packaging Grid Results
Saved Packaging Grid Results exist when:
The Grid Overrride Wizard is used.
A fund has previously been packaged and the Packaging Grid used during packaging is configured with 'Award once per fund scope period' or 'Award once for student' for the Packaging Frequency.
When a fund is configured with the ‘Packaging Grid’ option for the packaging philosophy, eligibility for the fund will be determined by first determining if saved Override Packaging Grid Results or previous Packaging Grid Results exist for the fund for the scope period during the packaging process. The saved Override Packaging Grid Results is used first in repackaging the student. If no saved Override Packaging Grid Results exist, the previous Packaging Grid Results are used in repackaging the student. The Persistence Packaging Option (e.g. Grid Cell Reference, Grid Cell Value or Award Amount) associated with the saved Override Packaging Results or previous Packaging Grid Results are used in the packaging process when determining the award amount for the fund.
If the Persistence Packaging Option is set to Grid Cell Reference, packaging looks at the previous Packaging Grid Results (the saved Grid Cell Reference) and uses the original Grid Cell Reference and Package To option to repackage the fund. For example, if the original packaging used cell 2,3 (2nd column, 3rd row) and the Packaging Grid was configured to Package To a % of Amount of Direct Costs, the % listed in Grid Cell B3 is used when repackaging the student as the Package To Amount.
If the Persistence Packaging Option is set to Grid Cell Value, packaging looks at the previous Packaging Grid Results (the saved Grid Cell Value) and uses the original Grid Cell Value and Package To option to repackage the fund. For example, if the original packaging used a Grid Cell Value of 90% and the Packaging Grid was configured to Package To a % of Amount of Direct Costs, 90% is used when repackaging the student as the Package To Amount.
If the Persistence Packaging Option is set to Award Amount, packaging looks at the previous Packaging Grid Results (the saved Award Amount) and uses the original Award Amount to repackage the fund. For example, if the original packaging calculated an Award Amount of $2,000, $2,000 is applied to the applicable scope period(s) when repackaging the student.
Note: If the Recalculate for Program Changes option is selected, and it is the first time the student is being packaged for the program change, any previously saved Packaging Grid Results are removed and the new program is packaged and the new Packaging Grid Results are saved to be used in the packaging process when the student is repackaged in the new program. No awards are repackaged or updated in the original program. If saved Override Packaging Grid Results exist, and the Packaging Grid still applies to the new program, the override values are not removed. If the grid no longer applies to the new program, the saved Override Packaging Grid Results are removed.
Packaging Grid Criteria
All Packaging Grid Setup Options must be met to be considered eligible when packaging a fund configured to use Packaging Grids where no Packaging Grid Results already exist. For example, if a Packaging Grid is configured with the Select Grid Criteria Column = SAI and the Select Grid Criteria Row = Cumulative GPA, the corresponding column and row values met by the student (e.g. SAI = 0; Cumulative GPA = are used to determine the Package To Amount cell value that is used in the packaging process. All standard fund eligibility checks are also reviewed upon eligibility determination, including checks for SAP if 'SAP Required' is set or for an ISIR on file if 'ISIR Required' is set.
Funds Configured with 'Prorate Distribution Amounts'
If a fund is configured with 'Prorate Distribution Amounts' set, the cell value is used as the baseline amount when prorating the award. For example, if the cell value = 1000 and the 'Package To' is set to Flat Amount to COA, the number of units in the term is divided by the minimum FT enrollment units and the resulting % is multiplied by the baseline cell value of 1000.
Grid Override Wizard
Users may override an existing packaging grid determination on the Awards Tab using the Grid Override Wizard icon that displays for an award made using a packaging grid. Users may override the Grid Cell Reference, which is a change of the cell determined by the packaging grid for the student, or the Grid Value, which is the configured value for the Grid Cell determined by the packaging grid for the student.
Grid Override Wizard Screenshot Example
Activity Log Entry
An Activity Log Entry will be triggered when the saved Packaging Grid Results on the fund is added, changed, or updated OR if removed due to program change or change of site.
Event that causes Activity Log Entry | Date/Time Created | Activity Source | UserID | Activity Type | Entry posted to Description field | Sample Activity Log Entry |
---|---|---|---|---|---|---|
When the saved Packaging Grid Results on the fund are added, changed, or updated | [date/time] | User Action, or Staff Action | [userid] | Award Related | The [Fund Name] was packaged using Packaging Grids:
Note: The Grid Override line only displays if the Grid Override Wizard was used and an override is set. If the saved Packaging Grid Results on the fund is removed due to an eligibility change (e.g. Program Change or Site Change), the following Activity/Description is displayed: Eligibility for the [Fund Name] has changed and is no longer using Packaging Grids. | The Verizon Scholarship was packaged using Packaging Grids:
|
If the saved Packaging Grid Results on the fund is removed due to an eligibility change (e.g. Program Change or Site Change) | [date/time] | User Action, or Staff Action | [userid] | Award Related | Eligibility for the [Fund Name] has changed and is no longer using Packaging Grids. | Eligibility for the Verizon Scholarship has changed and is no longer using Packaging Grids. |